In Conjunction with Total Swimming, Ascot Services have been appointed as the main contractor for a Design & Build project to construct the new 50m swimming facility adjacent to the existing Becontree leisure centre on behalf of ‘Everyone active’ and the London Borough of Barking and Dagenham.

Project

Led by Total Swimming, the modular swimming Pool approach, were the pool decking area sits above normal ground level eradicates the need for extensive excavations, which means that much needed new swimming pool facilities can be delivered within efficient timelines and in line with current budget streams available in both the public and private sectors.

Working closely with the architect’s means we can overcome any design issues easily, and offer a proactive approach in the construction of the new facility.

The completion of the below project will provide extra new swimming facilities for the local community, providing lessons and open swimming in a quality constructed new environment.

THE CONSTRUCTION

Ground Bearing Concrete Slab

New drainage system

Steel Framework Superstructure

Kingspan roof cladding

Trespa Rainscreen

Sto Render

New changing facilities

New Ventilation system

Fire Alarm System

New LED Lighting

LPHW System

Domestic hot & Cold Water System

New Building management system

Energy Management

New pool plant

1.2m modular deck swimming pool

BREEAM rating achieved “very good”

CONTRACT DURATION

6