Latest news:
"Going from strength to strength"
"Customer peace of mind"
We offer:
Tendering Services
Available to provide fast, technical and commercial advice.
Pre tender surveys.
Preparation of outline specifications.
Evaluation of enquiry specifications and drawings to highlight potential issues.
Preparation of technical tenders.
Negotiation with suppliers and subcontractors to ensure best prices are obtained.
Preparation of commercially competitive tenders.
External design support.
Electrical Services
Lighting & Emergency Lighting.
Low voltage electrical installation/maintenance.
Routine electrical maintenance & fault finding.
Electrical inspection & testing/Thermal image surveys.
Metering/Monitoring of electrical supplies.
Installation of control systems.
Mechanical Services
Electrical & Mechanical Plant Installation.
Commissioning & Maintenance.
Heating System Installation.
Commissioning & Maintenance.
Ventilation Ductwork Installation.
Cleaning.
Commissioning HVAC Services Including:
Water Treatment.
O&M Documentation.
Commissioning Management.
Construction & Building Services
General Building Maintenance / Reactive Maintenance.
General Groundwork's.
Drains & Sewer Cleaning / Inspection.
Additional Services
Project Management.
Ability to Subcontract.
Recent Projects:
"Greater Manchester Fire & Rescue"
"Parklands, Speke, Liverpool"
"QE2 Law Courts Liverpool"
We cover:
Atherton
Wigan
St Helens
Bolton
Leigh
Lancashire
Cheshire
Warrington
Liverpool
Salford
Manchester
Greater Manchester
Merseyside
North West
Ascot Services UK Ltd: The Sawmills, 52 Rosedale Avenue, Atherton, Manchester M46 0DZ
Ascot Commissioning Services UK Ltd: 153 Elliot Street, Tyldesley, Manchester M29 8FL

Home | Company | Services | Management | Verification | Certifier









© 2012 Ascot Services UK Ltd -
Pre Commission Cleaning of LPHW & CHW
• Our Water Treatment engineer would attend site to carry out a water treatment survey to ensure the flushing activities can be carried &offer advice where necessary.
• We would require systems being complete, pressure tested and all circuits and valves being fully open prior to our attendance on site.
• We would complete the flushing activities in one continuous site visit including back flushing.
• We would utilise the permanent circulating pumps and the introduction of temporary drain off points.
• All sensitive items of plant would be by-
• Any items of plant, which may be susceptible to blockage or damage from the cleaning
process, would be by-
• Pre commission cleaning will be carried out in accordance with the requirements of the specification and BSRIA application guide on Pre Commission Cleaning AG1 2001 and will briefly consist of an initial dynamic flush, chemical clean, post clean dynamic flush and final corrosion inhibitor and biocide dosing.
• All items by-
• The mains water supply should, in the absence of any other priorities, are sized, so that the minimum flushing flow rates in the system can be achieved as per BSRIA AG1/2001 water table guidelines.
• Appropriate mains water pipe sizes can be related to system volumes. A minimum
pressure of 3-
• The filling loop must be sized in accordance with AG1/2001. (See table below) The water supply must be no further than 20m from the main return pipe work within the pump plant room.
System Volume (litres) <2000 | 2000 – 10,000 | >10,000
Minimum mains size (mm) 25mm | 40mm | 50mm

WATER TREATMENT:
Ascot Commissioning Service UK Limited offer to supply the expertise and instrumentation necessary to carry out the Water Treatment and Commission duties as indicated below.

• Foul drains capable of receiving flushing water at the maximum rate of 4l/s per second within 10 metres of all plant.
• The system is to be provided with low point drains of the straight through type on all main return pipes. The size of drain required to be agreed prior to commencement.
• By-
• A list of the materials used in the construction of the systems should be made known to us to ensure complete compatibility with the chemicals intended for use. In particular we need to ensure if aluminium is present within the system.
• A full witness of all operations would be offered as cleaning and flushing operations can be adversely affected by delays in the programme.
• We can supply a discharge effluent license.
• TVC/SRB/PSEUDOMONAS samples are included.
Chlorination:
• We would require for the system to be completed in one continuous site visit.
• All GRP tanks and Hot Water storage vessels are to be chlorinated and cleaning can be arranged if required.
• Designated flushing points to be agreed prior to commencement.
• We require 15mm gate valve or quarter turn valve after the incoming main isolation
valve. Drain cocks are no longer required due the valves acting as a non-