The project involved the replacement of the existing circulating pumps including new flexible connections, isolating valves, pipeline strainers, pressure/altitude gauge cocks and Commissioning Stations.
In addition the works incorporated the wiring of the replacement pumps and connection of the Differential Pressure switches into the BMS system and relevant panel modifications.
|